刘伯温精选一码期期准196期

<form id="b0nrv"><legend id="b0nrv"></legend></form>
  • <strike id="b0nrv"><legend id="b0nrv"></legend></strike>

    1. <nav id="b0nrv"><code id="b0nrv"></code></nav><form id="b0nrv"></form>

      <var id="b0nrv"><code id="b0nrv"><blockquote id="b0nrv"></blockquote></code></var>

      <sub id="b0nrv"></sub><sub id="b0nrv"><address id="b0nrv"><nobr id="b0nrv"></nobr></address></sub>
      1. <nav id="b0nrv"></nav>

        <form id="b0nrv"><th id="b0nrv"><track id="b0nrv"></track></th></form><wbr id="b0nrv"><legend id="b0nrv"></legend></wbr>
        ?

        Navigation

        sail Online
        Visited by mobile
        back top

        MPC SERIES FLAT RAIL WAGON

        Transportation

        Able to withstand traction force, automatic force, collision force between mine cars and track impact force/simple structure/sturdy and durable/small electrical resistivity/large carrying capacity/easy to maintain/riveting structure/long service life/stable operation/

        sales@chinacoalintl.com
        +86-18660761375

        Category

        Menu

        weixin
        Flat Rail Mine Car

        Environmnet

        MPC series flat rail wagon is suitable for the underground mining, underground tunnel andindustrial site surface transportation.

        Flat Rail Wagon Application

        To carry loads along assembly lines; transfer material from one work station to the next; store and transport an entire shift worth of production. They can even be used as a stable yet moveable machine base.

        Flat Rail Wagon Features

        The frame is designed into metal structure, which can withstand the traction,the car collision between impact force and the rail.

        Simple structure, durable, small resistance coefficient,large capacity, easy maintenance.

        Reduces the impact of stress and increases the service life by adopting the car frame in welding structure.

        Ensure operating smoothly no matter on curve or straight rail.

        Model Defination

        For Coal Mine

        Flatbed

        Car/Vehicle

        Loading Capacity t

        ---

        Garuge

         MPC13-6 Flat Rail Wagon

        eg:MPC13-6 flatbed mine car

        Meaning: 13T loading capacity, 600mm guage flat rail wagon for coal mine

        Parameter
        Pictures are for reference only as different product batch & specs.Please contact sales for confirm.
        Model Loading
        /t
        Garuge G Overall Dia Wheel Base
        C
        Wheel Dia
        D
        Traction
        Height
        h
        Rated
        Traction
        /kN
        Min Radius
        of Runing Surface
        m
        Length L Width B Height H
        mm
        MPC2-6 2 600 2000 880 410 550 300 320 60 9
        MPC3-6 3 600 2400 1050 415 750 300 320 60 12
        MPC5-6 5 600 3450 1200 480 1100 350 320 60 12
        MPC5-9 5 900 3450 1320 480 1100 350 320 60 12
        MPC13-6 13 600 3350 1400 342 1000 220 270 60 12
        MPC18-6 18 600 3350 1400 346 1000 220 270 60 12
        MPC26-6 26 600 2400 1462 390 1100 240 280 60 12
        MPC10-6 10 600 3460 1300 304 1100 250 230 60 12
        MPC10-9 10 900 3460 1300 304 1100 250 230 60 12
        MPC15-6 15 600 3460 1300 357 1100 300 320 90 12
        MPC15-9 15 900 3460 1300 357 1100 300 320 90 12
        MPC20-6 20 600 3460 1300 364 1100 300 320 120 12
        MPC20-9 20 900 3460 1300 364 1100 300 320 120 12
        MPC25-6 25 600 3460 1300 390 1600 350 320 140 15
        MPC25-9 25 900 3460 1300 390 1600 350 320 140 15
        MPC30-6 30 600 3460 1300 400 1600 350 320 170 15
        MPC30-9 30 900 3460 1300 400 1600 350 320 170 15
        Note:Height H and Traction Height h measured since rail surface.
        Flat Rail Wagon Principle

        Working Principle

        Driven by locomotive or winch, running alone railway underground mine or tunnel, transport mining materials and equipment.

        Structure

        Pictures are for reference only as different product batch & specs.Please contact sales for confirm.

        Structure

        mainly consists of frame, buffer device, wheel set( open-wheel, closed-wheel, connection device, etc.

        The frame fashioned iron should be straightened not be larger than 1.5 ‰ before plug weld. Two frame sides parallel degree of tolerance for the length of 2 ‰.The flatness tolerance of the flame is 2 ‰ to the frame length (buffer not included ), but the max flatness tolerance should less than 5 mm.

        The center of the frame surface traction device should be symmetry to the longitudinal center plane of the frame, and its symmetry tolerance should not exceed 6mm.

        Flat Rail Wagon

        Close-Wheel Set Grease, dirt, the scrap iron and blockage should be removed before attempting assembling.

        Wheel should not appear crack, 10 mm in length range appeared on top of the rim and the end part of the profile of tiny crack, should not be more than two.

        Surface defects such as trachoma, porosity of round hole,that the area smaller than 16 mm2, the depth is less than 3 mm, 30 mm apart or more, shall not exceed three.

        Open Wheel SetConstituted by wheel,shaft,bearing,etc.Its technical conditions comply with the provisions of "JB/T6992-1993". Clean the iron and blockages, and clean the parts before front wheel assembly,bearing should assembled by no shock load method, make sure the wheel rotation flexibility.

        Bumper technical conditions in accordance with JB/T6992-1993 Buffer has enough strength, cushioning material toughness value of not less than 30J/cm2,cast steel bumpers there shall be no crack, on the surface of cast steel bumper bolt hole and end face not allowed any defects and shall not carry out welding.

        Connection device is composed of connection three-ring chain, bolt. Connection three-ring chain conforms with the standard requirements of" MT 244.1 - 2005 coal mine narrow gauge vehicle fittings connection chain ". Connecting pin conforms with the standard requirements of"MT 244.2-2005 mine narrow gauge vehicle connector connecting pin".

        Installation,Commissioning

        Pictures are for reference only as different product batch & specs.Please contact sales for confirm.

        Installation

        Before assembling,all the parts should be inspection qualified. All parts should be clean, and assembly in a clean environment. Assembled dimension deviation: the total width of mine material car and the high traction deviation of ± 3 mm, total high deviation of ± 8 mm, length deviation of ± 10 mm. Deviation of the length of - 10 ~ 0 mm, width deviation of plus or minus 3 mm.

        Flat Rail Wagon
        Flat Rail Wagon

        Commissioning

        Observe whether the wheels rub on the track,handle it in time to prevent damage once the phenomenon occurs.

        Observe whether tilt,out of orbit or overturned after it sliding along the slope curve and colliding with another car.

        Observe the runing codition on the minimum radius of curvature of the track.

        Test Run, Maintance Notes

        Pictures are for reference only as different product batch & specs.Please contact sales for confirm.
        Flat Rail Wagon

        Mine car should be without serious damage, wheels should be flexible, non-blocking.

        Within six months from the received date, mine car damaged or not working properly due to poor manufacturing quality, supplier shall repair or replace for free.

        Bearing cage opening towards out when replacing, maintain proper clearance.

        Seals should be used the original distribution.

        a.Operate strictly to the rules.

        b.Do not allow overloading.

        c.Do not do any cleaning during working process.

        Flat Rail Wagon
        Flat Rail Wagon
        • Flat Rail Wagon
        • Flat Rail Wagon
        • Flat Rail Wagon

        MA Certification

        Pictures are for reference only as different product batch & specs.Please contact sales for confirm.
        Flat Rail Wagon

        Product Feedback

        Average Star Rating:

        History Feedback: (${page.list})

        Latest Feedback

          Star Rating:
          Click to replace the verification code. Refresh
          ?

          +

          +

          Please leave a message

          Related Products
          刘伯温精选一码期期准196期